Preparations before reciprocating hoisting

Reciprocating elevators are conveying equipment used in some large construction sites. Shanghai Yuyin and you discuss some preparations before installing the reciprocating elevators:

1. Understand the site layout and installation of the installation site, and clear the surrounding obstacles.
2. Check the boom, parts and circuits of the reciprocating hoist.
3. Installation and construction of reciprocating hoist boom.
4. Complete construction tools: 4 special wrenches ; 4 M24 wrenches ; 4 M16 wrenches ; 2 300x26 wrenches ; 1 cross and flat screwdriver ; 2 multi-purpose pliers ; 2 0.7 kg hammers ; 1 sledge hammer ; 40x30x30cm2 ; 2 10mm steel wire ropes , 4m each ; 2 crowbars ; 5kg iron wire ; 10 hard hats ; 6 safety belts ; 2 fire extinguishers ;
5. Staffing: 1 person to command , 2 people to install bolts, 1 person to monitor the ground , and 1 person to carry small objects .
6. Set up and install ground fences, hang up warning signs, set up special personnel to monitor, and provide safety technical knowledge to the operators. Wear safety belts, safety helmets, work shoes, and tools. The commander will direct the installation work.
7, to ensure that the installation site has a good power supply, lighting facilities, etc., prepare suitable lifting equipment to make the road clear, and there is enough open space to store various parts and so on.
8. According to the instructions, prepare the foundation, and ensure that the embedded parts on the foundation are cast to the correct position. The reciprocating hoist should be installed as close to the building as possible, so that the installation of the wall bracket and the stair climbing device can be simplified. The distance to the wall must be at least 1.8m .
9. During the entire installation process, the installer must carefully check all the components. If they are damaged, they must be replaced or repaired.
10. The installation site should be properly isolated and set warning signs.
The reciprocating hoist is the most common tool in some large construction sites. It can be said that it is an indispensable construction machine in some construction sites. The installation sequence is: foundation preparation ------ embedded wall attachment ---- --Bottom frame ------ Basic section installation ------ Protective fence installation ------ Standard section and other wall bracket installation ------ Hanging cage installation ------ Electrical installation and adjustment --- Installation and testing of the whole machine.

Shanghai Yuyin Machinery Co., Ltd. http://shxierui.com/



Product Navigation: Belt Conveyor Drum Conveyor Mesh Belt Conveyor Screw Conveyor Chain Plate Conveyor Sorting Conveyor Mesh Belt Chain Plate Sprocket Roller Fluent Universal Ball Fulai Wheel Adjusting Foot Bearing Block
Conveyor | Conveyor line | Production line | Conveyor equipment | Conveyor accessories | Sitemap | Sitemap | Yuyin Machinery QQ Online Customer Service 沪 ICP 备 10041176 号 -2
Copyright: Shanghai Yuyin Machinery Co., Ltd. Address: Room 549, Zone B, 5th Floor, No. 1288 Huateng Road, Qingpu District, Shanghai Phone: 021-669790948 13917412877 Email: sales@yuyin.shxierui.com
Yuyin-expert in transportation equipment, quality person in domestic logistics transportation industry!
中文电子游戏官网 电玩城游戏大厅 正规棋牌游戏平台 九五至尊网站是多少 网上棋牌手游大全 电子捕鱼平台 最火的捕鱼游戏 沙巴体育平台 帝豪游戏平台 胜博发娱乐游戏