新澳门金沙网址

Product Navigation
Shanghai Yuyin Machinery Co., Ltd. Contact Us:
Miss Li 13917412877 Tel: 021-69790948 / 69790949 Fax: 021-69792046
National Free Hotline: 400-668-0948
Your present location: ConveyorNews Center > Detail

Precautions and routine maintenance of chain plate conveyor failure

Published: 2014-9-22 10:04:28 Source: Conveyor http://shxierui.com Author: Hai Yu sound machine

It can be seen from the failure cause analysis of the transmission chain of the chain plate conveyor that the failure reason of the chain plate conveyor is often not independent, but is the result of several types of interrelation and interaction. For example: the card chain will cause overload, and the chain Plates , chain links, and ring chains all produce different levels of impact energy, which causes the dynamic tension of the entire transmission chain to increase, and the weakest parts in the transmission chain will be severely deformed or broken (often the connection chain) Ring); when the connecting ring or connecting chain breaks, the surrounding connecting ring, connecting chain, and chain plate will be damaged by different degrees of impact damage, which greatly reduces its service life and reliability; corrosion, wear and long-term Stress pulsation weakens the overall strength of the conveyor chain and accelerates fatigue failure, while fatigue and corrosion also accelerate wear. And each cause of damage is not just for one component, it will affect the entire chain plate conveying system, but the damage will only occur in the weakest part. Therefore, it is necessary to comprehensively consider the causes of the failure of the conveying chain during the operation of the chain conveyor, reduce the hazards that can be avoided, prevent the occurrence of the failure to the greatest extent, and improve the operational reliability of the conveying equipment .
(1) Selection of conveyor chain components
When purchasing, you should choose a reasonable chain plate conveyor according to the actual conveying conditions, so as to choose the appropriate specifications and types of conveyor chain components (chain plates, connecting links, connecting chains). The products of manufacturers with good reputation and meeting the relevant quality standards shall eliminate the use of unqualified conveyor chains and strengthen the quality control of the materials of the connecting chain and the link ring, considering not only their strength but also their elongation; Components to improve the corrosion fatigue strength of the chain plate; avoid surface defects where the link ring arc meets the inside of the straight edge as much as possible to reduce the stress concentration there and slow down the occurrence of cracks.
(2) Assembly of the conveyor chain
The transmission chain must be assembled strictly according to the paired chain when it leaves the factory. The length of the chain must be provided according to the installation requirements. The chain must not be distorted. The installation position and direction of the chain plate, the connecting ring and the connecting chain should meet the installation requirements. The welding seam of the ring should be upward to reduce the wear of the welding ring and the abrasion of the groove bottom plate to extend the life of the connecting ring; the connecting ring must be properly connected according to the installation requirements, and the bolts or pins must be installed in place; Frequent jogging is strictly prohibited during installation to avoid damage to parts.
(3) Laying of the trough of the chain conveyor
If the groove of the chain conveyor is laid uneven, it will not only increase the running resistance of the conveying chain, but also cause a continuous impact force on the entire chain conveyor (which can be avoided). Parts have varying degrees of stress damage. Therefore, the grooves of the chain conveyor should be laid straight; the chain conveyor should be laid flat. If the strength of the floor is insufficient, reinforcing ribs can be used on the back of the floor, which will help reduce wear and power consumption.
(4) Pre-tensioning of the conveyor chain
The tension of the conveyor chain should be moderate to make it meet the installation requirements. Check whether the conveying chain is properly tensioned. The easiest way is to jog the drive to tension the chain and count the number of loose connection chains under the head sprocket. If there are more than two, some connection chains need to be removed. . Within two weeks of the operation of the chain conveyor, special attention should be paid to the conveyor chain of the chain conveyor, because at the beginning of operation, a part of the elastic deformation of the conveyor chain will be gradually eliminated, and it must be tensioned in time to avoid jumping chains and card jams. Chain phenomenon.
(5) Daily maintenance of chain conveyor
Strengthening the daily inspection and maintenance of the chain plate conveyor is very important to extend the service life of the conveying equipment, keep the conveying equipment intact, and realize the safe operation of the conveying equipment. Therefore, systematic and effective business and professional quality training for operating staff, improving the professional skills and ethics of operating staff, can effectively prevent accidental failures and enhance the reliability of safe operation of conveying equipment. The conveyor chain of the chain plate conveyor should be inspected regularly in detail, and problems should be dealt with or replaced in time. If the reliability of the link ring is weak, excessive deformation and wear must be replaced in time; the chain conveyor runs for a period of time. After time, the direction of the horizontal and vertical links of the connecting chain can be changed to change the wear position, so as to extend the service life of the connecting chain; adjust the tension of the transmission chain in time to ensure that the pretension of the chain meets the requirements; It should meet the installation requirements, and make up or replace missing or damaged chain plates in time; replace excessively worn power sprocket in time to avoid speeding up the damage of other parts and transmission chains; when using the old connection chain, it must be used in pairs of equal length For connecting chains, it is strictly forbidden to use connecting chains of different lengths and connecting chains with breaking strength that does not reach the standard. During the operation of the chain conveyor, it is strictly forbidden to stop waiting for the material to cause material accumulation and overload. Remove large materials in a timely manner. It is best to add a large and steel debris screening device to the feeding place. Smooth, clean up foreign objects in time to prevent jamming; prevent brutal operations and frequent starts, and avoid full and overload starts.
There are many types of fault performance of chain conveyors, and the substantial causes of failures are intertwined, but as long as the above five aspects are done well, the failure rate can be effectively reduced, and the normal operation of the chain conveyor can be guaranteed, thereby ensuring the normal operation of the entire production system. .



Product navigation: conveyor belt roller conveyor belt conveyor screw conveyor chain conveyor sorting conveyor belt chain plate sprocket roller fluent universal ball blessing to round adjust foot chocks
Conveyor | Conveyor line | Production line | Conveyor equipment | Conveyor accessories | Sitemap | Sitemap | Yuyin Machinery QQ Online Customer Service 沪 ICP 备 10041176 号 -2
Copyright: tone Haiyu Machinery Co., Ltd.: Road Qingpu Titan 1288 a 5 layer B compartment 549 Tel: 021-69790948 13,917,412,877 In Email: sales@yuyin.shxierui.com
Yuyin-expert in transportation equipment, quality person in domestic logistics transportation industry!
中文电子游戏官网 电玩城游戏大厅 正规棋牌游戏平台 九五至尊网站是多少 网上棋牌手游大全 电子捕鱼平台 最火的捕鱼游戏 沙巴体育平台 帝豪游戏平台 胜博发娱乐游戏